Asbestos insulation removal in Kent

Typical cost in Kent

  • Pipe insulation in a basement, about 50 to 150 ft of pipe$1,500 – $4,500+
  • Old furnace or boiler with its ducts or pipes and their insulation$4,500 – $12,000+
  • Attic vermiculite or loose-fill, about 800 to 1,500 sq ft of attic$8,000 – $20,000+

Asbestos insulation can wrap basement heating pipes, jacket an old boiler or furnace, sit loose in an attic or hide behind a wall you are about to open. Each one changes how we reach it, how we test it and what follows removal.

We also work in Covington and Maple Valley. Mention whether the insulation is on pipes, a furnace or boiler, or in the attic, and what work is planned next.

Tell us about your project
Insulated heating pipes in a basement mechanical area

Asbestos insulation removal options

Pipe and fitting insulation

Elbows and fittings can be a different material from the straight pipe, so we take a separate sample from each. We mark where our work starts and stops, which system the pipe belongs to and what stays in place. Before scheduling the work, we talk through access and the shutoff with you, especially if a plumber replaces the pipe after us.

Boiler and equipment insulation

How we work around a boiler or furnace depends on whether it is staying, being replaced or just being disconnected. We test the jacket, nearby insulation and any surfaces the work will touch. Before we start, we agree who disconnects the unit for removal and who gets your heat back on.

Vermiculite attic insulation

We test loose vermiculite in an attic differently from wrapped pipe. Please don't go up there or move the fill to take photos or a sample. Whatever the attic work is, such as new wiring, venting or insulation, we plan the testing and access around it.

Insulation behind finishes

A wall or ceiling you open can turn up insulation nobody expected. If that happens, leave the opening as it is and let us test the material before the hole gets any bigger. We tell your remodeler where the material is and what to stay away from, so demolition stops short of anything untested.

Planning around your heat and attic

We plan around the other trades and around whatever has to keep running while we work, such as the heating. With you, we settle who shuts systems down, when you can use the space again and who puts new insulation back. If the job needs an air test, we explain it as its own step. The disposal paperwork and the clearance to use the room again are two different documents.

Survey and project requirements in Washington

From 10 ft of pipe, or 48 sq ft of duct wrap or other material, Puget Sound Clean Air Agency is told before work. Every bag we take out is sealed and hauled.

If other materials are in the way, see everything we remove.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (253) 893-4144

Call (253) 893-4144