Asbestos Removal in Kent

At Kent Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Empty room with a sealed containment partition and portable air-filtration equipment
Asbestos popcorn ceiling removalAsbestos floor tile and mastic removalAsbestos insulation removalAsbestos siding and roofing removalAsbestos abatement before renovation and demolitionCommercial asbestos abatement

Residential asbestos removal services

Textured popcorn ceiling in a 1970s living room sealed off with plastic sheeting for abatementNine-inch vinyl floor tiles and black mastic partly exposed in an older kitchen

Asbestos popcorn ceiling removal

Ceilings in the same house do not always match. A coat of paint, an old patch or a later remodel can each change what is up there, so we sample every ceiling the work will touch. We take off only the texture that tests positive. Skim coating and paint come after, from your drywall finisher.

Asbestos floor tile and mastic removal

One floor can hold three materials: tile, the black glue under it and the backing on sheet flooring. We test them separately, because one can be positive while another is clear, and we lift only what the lab flags. We work out with you and your flooring installer who repairs and preps the subfloor before we start.

Insulated heating pipes in a basement mechanical areaIntact gray cement-shingle siding on the exterior of a house

Asbestos insulation removal

Wrap on a basement pipe or boiler and loose fill in the attic are very different jobs. Please leave suspect insulation alone until we have looked. We note where it is, what shape it is in and what your project will disturb, then plan access, any heating shutdown and what goes back in.

Asbestos siding and roofing removal

We test cement siding and roofing before it is replaced or the building comes down. We plan our removal around the new siding or roof, especially where new openings or hidden layers will be exposed, and work out access, handling and how the building stays dry once it is off.

Older wood-sided house behind a chain-link fence, prepared for demolition, with a plastic-lined dumpster, wet gravel and fir trees under an overcast sky

Asbestos abatement before renovation and demolition

For a remodel we survey the rooms you are changing; before a tear-down we survey the whole building. Send us the plans before any demolition starts. We coordinate any notice that is needed, remove what tested positive in the right order and tell your remodeler or wrecking crew when they can take over.

Commercial asbestos removal projects

Empty commercial room with floor tiles and a containment partition

Commercial asbestos abatement

Tenant improvements, shared buildings and commercial demolition all mean working around other people. We find out which suites, shared air systems and access routes the work touches and schedule the survey and removal around them. Owners and tenants get the records they need and a clear word on when they can use the space again.

Asbestos testing and removal costs

Nearly 4 in every 10 Kent homes were built before 1980, making asbestos a common issue in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Kent, Covington and Maple Valley. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos survey and removal before a remodel or tear-down

  • Asbestos survey before a remodel, one house$400 – $1,000+
  • Abatement for one room remodel, such as a kitchen or bathroom$2,000 – $6,000+
  • Asbestos survey before tearing down a house$800 – $2,000+
  • Abatement of a whole house before tear-down$10,000 – $30,000+
What is included

A survey that samples each finish separately, the lab report, and removal of only the materials that test positive, with disposal and cleanup. Before any house is torn down, Puget Sound Clean Air Agency needs a survey and a notice. Framing, finishes or wrecking are bid by the contractor who does them.

Get a free quoteSee an example projectAbout this service

Asbestos popcorn ceiling removal

  • One or two small ceilings, about 150 to 250 sq ft in all$1,800 – $4,500+
  • Several rooms or one floor, about 600 to 1,000 sq ft$5,500 – $14,000+
  • Whole house, about 1,500 to 2,000 sq ft of ceiling$10,000 – $25,000+
What is included

A sample from each ceiling that looks or dates differently, then plastic, the positive texture soaked and scraped, sealed bags, disposal and a final clean. Once a ceiling passes 48 sq ft, Kent jobs go on file with the agency. Painted texture takes longer. Skimming and repainting are quoted by your drywall finisher.

Get a free quoteSee an example projectAbout this service

Asbestos floor tile and mastic removal

  • A small floor or a strip of floor, about 50 to 100 sq ft$1,200 – $3,000+
  • One kitchen or large room, about 150 to 300 sq ft$1,800 – $5,000+
  • Several rooms, about 500 to 1,000 sq ft$4,000 – $12,000+
What is included

The tile and the black adhesive tested separately, plastic at the work area, the tile lifted wet and the adhesive scraped by hand, bagging, disposal and cleanup. Nothing is filed for tile that lifts out in whole squares. The next floor, or the drain or slab work, is someone else’s quote.

Get a free quoteSee an example projectAbout this service

Asbestos insulation removal

  • Pipe insulation in a basement, about 50 to 150 ft of pipe$1,500 – $4,500+
  • Old furnace or boiler with its ducts or pipes and their insulation$4,500 – $12,000+
  • Attic vermiculite or loose-fill, about 800 to 1,500 sq ft of attic$8,000 – $20,000+
What is included

The furnace, its ducts or the pipes closed off in plastic with an air machine pulling the dust out, the covering soaked and taken off, every bag sealed and hauled, then air samples. From 10 ft of pipe, or 48 sq ft of duct wrap or other material, the agency is told before work. The new furnace or insulation is extra.

Get a free quoteSee an example projectAbout this service

Asbestos siding removal

  • Siding on one wall, garage or shed, about 200 to 400 sq ft$2,500 – $6,500+
  • Siding on a one-story house, about 1,200 to 1,800 sq ft of wall$10,000 – $25,000+
  • Siding on a two-story house, about 2,000 to 3,000 sq ft of wall$16,000 – $40,000+
What is included

The positive siding kept wet and taken off whole, wrapped on plastic, hauled away, and the ground cleaned by hand. For cement panels the filing goes to Puget Sound Clean Air Agency ahead of the crew. New siding and framing are extra, and nobody prices a cement roof without first surveying it.

Get a free quoteSee an example projectAbout this service

Commercial asbestos abatement

  • Survey of a small commercial or apartment building$1,500 – $4,000+
  • Small office or shop area, about 500 to 1,000 sq ft$5,000 – $15,000+
  • Larger floor or building section, about 2,500 sq ft$12,000 – $35,000+
What is included

A survey of the space by an accredited inspector, a sealed work area, removal, disposal and an air test before the owner or tenant moves back in. For businesses, the need for a notice and its fee depend on the material and how much comes out. Offices and shops are quoted once we have seen them.

Get a free quoteSee an example projectAbout this service

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Our process

01

Test what the work touches

First comes a survey of whatever your project will disturb. We give the lab report to everyone who will work near it.

02

Agree the work area

We set the work area and access, check for a notice and plan waste removal before other trades start.

03

Hand back the space

You get the records and we say when the rooms can be used again. The next trade handles repairs and new finishes.

Only a lab test can tell

Nine-inch tile, black glue and cottage-cheese texture all look suspicious, but only a lab result tells you what is in them. Each result comes with a note of where that material is in the house. If a room has several finishes or patched areas, we sample each one.

Survey and project requirements in Washington

Puget Sound Clean Air Agency treats renovation and demolition differently. We confirm what your survey must cover, whether a notice is due and where the waste goes for your property. A building permit does not replace the asbestos survey.

Asbestos removal in Kent and nearby communities

We also serve Covington and Maple Valley. Call us for confirmation if your address is outside the area.

Frequently asked questions

Can you tell asbestos from a photo?

No. Tile, texture and wrap look the same with or without asbestos. When suspect material is damaged or a remodel will disturb it, we sample it and a lab tests it. That result is the only way to know.

Does all asbestos have to come out?

Not always. Material in good shape that your project will not disturb may be able to stay. We look at its condition and your plans and tell you whether it stays or goes.

Does removal include new flooring or ceiling finishes?

Not unless we agree it up front. Our prices cover the asbestos work and cleanup; new flooring, ceiling repairs and paint usually come from the trade that does them.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (253) 893-4144

Call (253) 893-4144