Asbestos removal options
Asbestos popcorn ceiling removal
Ceilings that look identical can test differently, because a later remodel, a coat of paint or a patch changes what is up there. On a split-level, the upper hall, bedrooms and bath may each need their own sample. We scrape only the ceilings that come back positive, inside plastic, and on a split-level we seal the stairway so dust stays upstairs. Painted texture takes longer to soak, so mention any paint when you call. The ceiling is left scraped and clean; skim coat, primer and paint are your drywall finisher's part.
Asbestos floor tile and mastic removal
Under an old kitchen floor there may be tile, a sheet floor below that and black glue at the bottom, each with its own test result. Tile size or color says nothing certain about which one holds asbestos. We ask about overlays and patches you remember, test every layer in the rooms you are changing and remove only the positive ones, including parts hidden under cabinets or walls if your work reaches them. Then we settle with you who repairs and preps the subfloor.
Asbestos insulation removal
A boiler jacket, the wrap on basement heating pipes and loose vermiculite in the attic each come out a different way. Don't move any of it, and stay out of an attic with loose fill, until it has been tested. If a leak has soaked pipe wrap, keep fans off it and leave fallen pieces where they are. Once we know what is there, we work out access, any heating shutdown and the replacement insulation with you, and set the order of work with your plumber or heating contractor.
Asbestos siding and roofing removal
Siding and roofing work is done outdoors, so weather is part of the plan from the start. We sample cement siding or roofing before an opening is cut or new material is ordered. We check which sides of the house are involved, whether an older layer sits underneath and where trim, windows or an attached structure mark the edge of the work. We time the removal with your siding or roofing crew so the house isn't left open.
Asbestos abatement before renovation and demolition
A bathroom update and a full tear-down get very different surveys. For a remodel, we follow the surfaces, openings and layers your plans will touch; for a tear-down, we cover the whole building and any other structure coming down. Getting your plans before demolition starts lets us sort out the results, any notice to the agency and the order of removal. We mark clearly what stays and what comes out, and tell your crew when each area is theirs.
Commercial asbestos abatement
In a tenant improvement, a shared building or a commercial demolition, the asbestos work has to fit around everyone else. A suite remodel may reach ceilings, floors and partitions while the neighbors stay put, so we ask for the full set of plans. We also look at the corridors, air systems and delivery routes a room-by-room list would miss. We fit the order of work to how the building is used.
City limits, county land and your permits
Some Maple Valley mailing addresses are outside the city limits, in unincorporated King County. So before we work out which permits apply, we look up the parcel for your address rather than going by the mailing city. That way your paperwork goes to the right office from the start.
Wherever the line falls, the testing is the same. We focus on what your project will disturb, whether that is a ceiling, a layered floor, part of the attic or the siding. If an addition or a new utility line takes the work past the original room, we test the new area before construction gets there. We also go over access and any landscaping you want kept, so both are in the removal plan.
Getting the job ready
Every surface and layer
"Kitchen remodel" can mean new paint or new everything, so we ask what you plan to cut or remove. Include each surface, any layer you think is hidden under it and any shed or detached garage that is part of the work. Send any older asbestos report as well, and we check whether it covered the same work. A design change after that should reach us before the crew reaches that part of the work.
Who handles what
The first thing we settle with you is the work area: which materials come out, where the plastic goes and how it stays apart from rooms in use and from other trades on site. You will know how we come and go and what is off limits during the work. Notice, waste and repairs afterward each need an owner, and with several contractors on separate contracts we agree who before work begins.
Records to keep
Three records come at the end of the job: the waste paperwork, our visual check and, if one was required, a clearance air test. We also tell you what asbestos, if any, is still in the building and what the next trade may disturb. Put it all with your house papers, so whoever remodels next knows what was done.
Survey and project requirements in Washington
A ceiling over 48 sq ft goes on file with Puget Sound Clean Air Agency before work starts. Send us your address and plans, and we tell you whether a notice is due on yours.